With the portal moved, the pellet should ricochet off the wall and bounce into the receptor. As soon as the pellet passes into the orange portal and out of the blue portal, quickly move the blue portal away from the slanted panel its currently on (move it anywhere). Next, position the orange portal on the wall panel directly under the pellet dispenser. First, place a blue portal on the angled wall panel under the pellet receptor, dead-center on the panel. In the first room of the testchamber is a high energy pellet dispenser as well as a receptor, both positioned on the ceiling.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |